Rough draft
Analyse validation outputs
How to analyse the validation outputs?
There are four types of validation outputs, each validation output provides information about the validation and has some possible actions.
Validation output actions
Open pipe assistant
Open the pipe assistant
Ignore elements
If you want to ignore the validation of this output in your report, you can use the ignore elements action
Undo ignore elements
Undo the ignore of a validation output
Open mapping assistant
Open the mapping assistant
Undo mapping
Undo the mapping of mapped elements
Navigate to
Navigate to the corresponding elements in the Hysopt and Revit model
Synchronise from Revit to Hysopt
Synchronise data from Revit to Hysopt
Synchronise from Hysopt to Revit
Synchronise data from Hysopt to Revit