/
Analyse validation outputs
  • Rough draft
  • Analyse validation outputs

    How to analyse the validation outputs?

    There are four types of validation outputs, each validation output provides information about the validation and has some possible actions.

    Validation output actions

    Open pipe assistant

    Open the pipe assistant

    Ignore elements

    If you want to ignore the validation of this output in your report, you can use the ignore elements action

    Undo ignore elements

    Undo the ignore of a validation output

    Open mapping assistant

    Undo mapping

    Undo the mapping of mapped elements

    Navigate to

    Navigate to the corresponding elements in the Hysopt and Revit model

    Synchronise from Revit to Hysopt

    Synchronise data from Revit to Hysopt

    Synchronise from Hysopt to Revit

    Synchronise data from Hysopt to Revit