• In progress
  • Data

    Data validation

    Data validation validates if pipe or zone parameters are synchronised.

    General

    Inner diameter {diameter} of {diameter name} in Hysopt does not match inner diameter {diameter} of mapped diameter {diameter name} in BIM

    Pipe

    Pipe diameter in BIM (Size …) and Hysopt (DN …) are the same

    Pipe length in BIM (… m) and Hysopt (… m) are the same

    Synchronise to Revit:

    Synchronise to Hysopt:

    Zone

    Synchronise to Revit:

    Synchronise to Hysopt:

    Â