Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

Data validation

Data validation validates if pipe or zone parameters are synchronised.

Pipe

 Success

Pipe diameter in BIM (Size …) and Hysopt (DN …) are the same

Pipe length in BIM (… m) and Hysopt (… m) are the same

Pipe zeta in BIM (…) and Hysopt (…) are the same

 Info

sqdfdf

 Warning

Missing diameter mapping for the BIM and Hysopt pipe, map the pipe diameters to enable diameter synchronisation

Synchronise to Revit:

 Error

Pipe diameter in BIM (Size …) and Hysopt (DN …) are not the same

Synchronise to Hysopt:

 Error

Pipe diameter in BIM (size … ) and Hysopt (DN …) are not the same

Pipe length in BIM (… m) and Hysopt (… m) are not the same

Pipe zeta in BIM (…) and Hysopt (…) are not the same

Zone

 Success

Zone volume in BIM (… m³) and Hysopt (… m³) are the same

 Info

sqdfdf

 Warning

fdsdg

Synchronise to Revit:

 Error

Synchronise to Hysopt:

 Error

Zone name in BIM (Space #) and Hysopt (<empty>) are not the same

  • No labels