...
Data validation validates if pipe or zone parameters are synchronised.
Pipe
Validation outputsSynchronise to Revit:
...
Synchronise to Hysopt:
Expand |
---|
|
Tip |
---|
Pipe length in BIM (… m) and Hysopt (… m) are the same |
Tip |
---|
Pipe zeta in BIM (…) and Hysopt are the same |
|
Expand |
---|
|
Note |
---|
Missing diameter mapping for the BIM and Hysopt pipe, map the pipe diameters to enable diameter synchronisation |
|
Expand |
---|
|
Warning |
---|
Pipe length in BIM (… m) and Hysopt (… m) are not the same |
|
Zone
...
Pipe zeta in BIM (…) and Hysopt (…) are not the same |
|
Zone
Synchronise to Revit:
...
Synchronise to Hysopt:
Expand |
---|
|
Tip |
---|
Zone volume in BIM (… m³) and Hysopt (… m³) are the same |
|
Expand |
---|
|
Warning |
---|
Zone name in BIM (Space #) and Hysopt (<empty>) are not the same |
|