Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Finally, an array of controls need to be added to the building to guarantee accurate working. The following list is some examples, however, this will be depended on the project.

  • Boiler control (constant, weather profile)

  • Control of 3-way valves and other mixing circuits

  • Controls over the headers

  • Pump controls

  • Vacation periods