Control strategy
Finally, an array of controls need to be added to the building to guarantee accurate working. The following list is some examples, however, this will be depended on the project.
Boiler control (constant, weather profile)
Control of 3-way valves and other mixing circuits
Controls over the headers
Pump controls
Vacation periods