Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 11 Next »

What is validated in a validation report?

The validation checks 3 items:

  • Mapping: Mapping validation

    • Components

    • Pipes

    • Zones

  • Semantics: Semantic validation validates if mapped elements have the same function/ role in the installation. This is done by checking the classification of elements.

    • Components:

  • Data: Data validation

    • Pipes

    • Zones

How to create a validation report?

You can request a validation, once you have a Revit project and a Hysopt model linked and mapped to each other (see Link Revit project and Hysopt model and Mapping).

  1. Click the validate button in the tab Validation

  2. The validation report window opens.

  3. The Hysopt BIM Syncer will validate the models and mappings. The validation generates outputs which can be viewed in the validation report.

What does a validation report look like?

Type of validation outputs

There are four types of validation outputs:

Success

Info

Warning

Error

Filter validation outputs

Type filter

You can filter validation outputs based on types.

Content filter

You can filter validation outputs based on content.

Revalidate

Download as Excel spreadsheet

How to analyse the validation outputs?

If you click on a validation, the Hysopt window and the Revit Window will automatically highlight the corresponding elements

  1. Synchronisation suggestions are available, see also Synchronisation

Demo movie

one-by-one generation from Revit spaces to Hysopt zones, and synchronisation of data

 

  • No labels