Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

What is validated in a validation report?

The validation checks 3 items:

  • Mapping: Mapping validation validates if elements are mapped.

    • General

    • Components

    • Pipes

    • Zones

  • Semantics: Semantic validation validates if mapped elements have the same function/ role in the installation. This is done by checking the classification of elements.

    • Components:

  • Data: Data validation validates if pipe or zone parameters are synchronised.

    • Pipes

    • Zones

How to create a validation report?

...

What does a validation report look like?

...

What is validated in a validation report?

The validation checks 3 items:

  • Mapping: Mapping validation validates if elements are mapped.

    • General

    • Components

    • Pipes

    • Zones

  • Semantics: Semantic validation validates if mapped elements have the same function/ role in the installation. This is done by checking the classification of elements.

    • Components:

  • Data: Data validation validates if pipe or zone parameters are synchronised.

    • Pipes

    • Zones

Type of validation outputs

...

An Excel spreadsheet of the validation report can be downloaded.

...

Download as Excel spreadsheet

Expand
titleDownload as Excel spreadsheet

If you click the download as Excel spreadsheet button, a save as window will open. Specify a file name and location for the validation report.

By clicking save, a toast message appears to mention that the file download is successful. There is an option to open the Excel spreadsheet or to convert it into a Revit sheet. Export Validation report

An Excel spreadsheet of the validation report includes all the validation outputs. The validation outputs are sorted by the 3 validation items (Mapping, Semantics and Data)