What is validated in a validation report?
The validation checks 3 items:
Mapping: Mapping validation
Components
Pipes
Zones
Semantics: Semantic validation validates if mapped elements have the same function/ role in the installation. This is done by checking the classification of elements.
Components:
Data: Data validation
Pipes
Zones
How to create a validation report?
You can request a validation, once you have a Revit project and a Hysopt model linked and mapped to each other (see Link Revit project and Hysopt model and Mapping).
Click the validate button in the tab Validation
The validation report window opens.
The Hysopt BIM Syncer will validate the models and mappings. The validation generates outputs which can be viewed in the validation report.
What does a validation report look like?
...
What is validated in a validation report?
The validation checks 3 items:
Mapping: Mapping validation validates if elements are mapped.
General
Components
Pipes
Zones
Semantics: Semantic validation validates if mapped elements have the same function/ role in the installation. This is done by checking the classification of elements.
Components:
Data: Data validation validates if pipe or zone parameters are synchronised.
Pipes
Zones
Type of validation outputs
...
You can filter validation outputs based on content.
...
Revalidate
If changes are made to the Revit project/ Hysopt model or you solved validation errors and warnings. You need to revalidate.
...
Download as Excel spreadsheet
An Excel spreadsheet of the validation report can be downloaded.
...
Download as Excel spreadsheet
Expand | ||
---|---|---|
| ||
If you click the download as Excel spreadsheet button, a save as window will open. Specify a file name and location for the validation report. By clicking save, a toast message appears to mention that the file download is successful. There is an option to open the Excel spreadsheet or to convert it into a Revit sheet. Export Validation report An Excel spreadsheet of the validation report includes all the validation outputs. The validation outputs are sorted by the 3 validation items (Mapping, Semantics and Data) |