Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

What is validated in a validation report?

The validation checks 3 items:

  • Mapping: Mapping validation

    • Components

    • Pipes

    • Zones

  • Semantics: Semantic validation validates if mapped elements have the same function/ role in the installation. This is done by checking the classification of elements.

    • Components:

  • Data: Data validation

    • Pipes

    • Zones

How to create a validation report?

You can request a validation, once you have a Revit project and a Hysopt model linked and mapped to each other (see Link Revit project and Hysopt model and Mapping).

  1. Click the validate button in the tab Validation

  2. The validation report window opens.

  3. The Hysopt BIM Syncer will validate the models and mappings. The validation generates outputs which can be viewed in the validation report.

What does a validation report look like?

Image RemovedImage Added

Type of validation outputs

There are four types of validation outputs:

Tip

Success

Info

Info

Note

Warning

Warning

Error

Filter validation outputs

Type filter

Content filter

How to analyse the validation outputs?

If you click on a validation, the Hysopt window and the Revit Window will automatically highlight the corresponding elements

  1. Synchronisation suggestions are available, see also Synchronisation

Demo movie

one-by-one generation from Revit spaces to Hysopt zones, and synchronisation of data