Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Current »

This error is indicated when requesting for a dynamic simulation. The simulation cannot be started because of the 'unconnected boiler temperature'. The boiler still needs to be supplied with an appropriate set point temperature (e.g. heating curve).


This base circuit indicates that the 'base circuit is not assigned to a zone'  when requesting for a dynamic simulation. Currently the software doesn't know in which building zone the radiator must drop its heat. Before running a simulation, the radiator must be assigned to the right zone (see building and loads library). 

  • No labels