Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »



Control generator

NameDescription

Loop Back

This BC is necessary if you want to loop a signal back (in the next timestep)
Here an example in which the resulting signal to control the boiler is looped back towards the controller


  • No labels