The BTES 1.0 templates are divided into different types of regime temperature combinations for heating and cooling end-units. To clarify this aspect the different templates are the following.
LT heating + HT cooling
HT cooling + HT and LT heating separate
HT cooling + HT and LT heating together
LT heating + LT and HT cooling separate
LT heating + LT and HT cooling together
HT and LT heating separate + LT and HT cooling separate
HT and LT heating together + LT and HT cooling separate
HT and LT heating separate + LT and HT cooling together
HT and LT heating together + LT and HT cooling together
LT heating + HT cooling
...
Working principle
The working principle of a geothermal system is divided into two main operating conditions, winter and summer. Of course, if there is both heating and cooling demand at the same time, both conditions are active.
...